首页展示

Installation process of pneumatic spot welding machine

Views : 31
Update time : 2022-04-28 08:19:24
The installation of the pneumatic spot welding machine is best carried out by professionals. Indiscriminate operation will lead to improper connection, which will cause irreparable damage to the machine. Below, in order to solve the problems in the installation process, I will introduce the specific process of installing the pneumatic spot welding machine in detail. I hope it can help you:

1. Before installation
Before installation, a simple inspection of the parts of the machine is required. If there is any damage, breakage, or aging, it needs to be returned to the original manufacturer in time. It should be noted that the parts of the spot welding machine are completely integrated, and any error in any link will affect the whole body and cause the machine to fail. It is the most basic requirement to ensure that the purchased parts are brand new.

2. Installation
After checking the integrity of the parts, the corresponding installation work can be carried out. When installing, it is best for the manufacturer to invite experienced people to assemble. Those who have not learned professional knowledge and have no experience can not assemble privately anyway. In addition, even experienced people need to operate according to the instructions given with the purchase of the device to avoid the phenomenon of wrong installation and loose connection in some places.

3. After installation
After installation, the spot welding machine can not be busy and put into work, and a simple test machine work must be carried out in advance. The assembled machine can be simply operated first, and after confirming that it is correct, it can be put into the factory for work. The test operation of the spot welding machine is also a necessary work to avoid waste of factory resources.